Business

Cong Hoa industrial park resumes operations after flooding

Hai Duong News 17/09/2024 16:25

Cong Hoa industrial park (IP) in Chi Linh city, Hai Duong province resumed normal operations on September 16 after floods had gone down.

Cả 9/9 nhà máy trong khu công nghiệp Cộng Hòa (Chí Linh) đã hoạt động ổn định trở lại
All factories in Cong Hoa industrial park have resumed operations

Around 3,000 employees of four factories in Cong Hoa IP have went back to work, equivalent to 60% of the workforce in the IP.

The remaining five enterprises in the IP are both operating, overcoming flooding, and cleaning some production areas to soon restore normal work.

Công ty TNHH Hàng tiêu dùng Kim Dương Việt Nam đã triển khai sản xuất bình thường
Work at Sungold Vietnam Co. Ltd. is restored

Earlier, due to the impact of Typhoon Yagi, the third to hit Vietnam this year, and prolonged rain afterwards, roads in Cong Hoa IP was flooded from September 12 – 14, a lot of trees were uprooted, etc., forcing the companies to temporarily suspend or reduce production.

As the water on the roads and in production areas receded on September 15, the limited liability companies of Sungold Vietnam, Vietnam Poyun Electronics, Nice Ceramic, Eastech Vietnam, etc. took the initiative to mobilize workers and equipment for clean-up.

Chủ đầu tư tổ chức phun khử khuẩn toàn bộ các khu vực điều hành, sản xuất, nơi tập kết hàng hóa (ảnh cắt từ clip do cơ sở cung cấp)
The investor disinfects all operating, production, and goods gathering areas in the industrial park

On September 15 and 16, Vietnam Rubber Industrial Zone and Urban Development JSC., the investor of Cong Hoa IP, also assisted the companies in cleaning and disinfecting all operating and production areas and ensured stable electricity and clean water supply.

Phase 1 of Cong Hoa IP was built on an area of 201 ha with an investment of 1,081 billion VND. It is basically full with 11 secondary investment projects, nine of which have gone into production and two are under construction.

The investor has proposed investment in phase 2 to expand the IP to over 390 ha.

Hai Duong News

Hai Duong News