Multimedia

Accelerating construction of North-South Expressway

TB (according to VNA) 20/08/2024 10:14

The 13th National Party Congress has set goals to develop 3,000 km of expressways nationwide by 2025 and 5,000 km by 2030. The Prime Minister has directed ministries, sectors, and localities to actively advance efforts to expedite the North-South Expressway’s completion.

1 ava.png
The Tuyen Quang - Phu Tho Expressway, connecting with the Noi Bai - Lao Cai Expressway, is officially inaugurated
2.png
Workers and machinery operate inside the Tuy An tunnel area, part of the Chi Thanh - Van Phong Expressway project
3.png
Contractor Hoa Hiep lays the second layer of asphalt (C19) for contract package No. 3 on the route
4.png
A section of the Nghi Son - Dien Chau Expressway passing through Hoang Mai Town, Nghe An Province
5.png
Than Vu 2 and O O are two impressive viaducts on the North-South Expressway section between Dien Chau (Nghe An Province) and Bai Vot (Ha Tinh Province)

TB (according to VNA)

TB (according to VNA)